Per-visit report

Site Progress Visual Reports

Structured photo and mark-up reports that document what has changed on site since the last visit, organised by work front and floor.

Book a site visit date through the contact form.

Construction site with concrete frame and temporary scaffolding under daylight

Who it is for

Owners who want independent visual evidence between formal progress meetings.

What you receive

A dated visual report owners can file with meeting minutes and lender packs.

Included

  • Guided walkthrough of agreed floors and work fronts
  • Annotated photo set with location labels
  • Short narrative of visible progress and blockers

Outside this scope

  • Structural or safety certification
  • Night or confined-space photography without prior arrangement

How the work proceeds

  1. Agree visit scope and access with the site team
  2. Conduct the walkthrough and capture evidence
  3. Deliver the labelled visual report

Preparation

Confirm site contact, PPE requirements, and floors to cover.

Constraints

Visits require site induction and escort as directed by the main contractor.